Kirtipur, Kathmandu, Nepal
Name: Narayan Timilsena
Position: Asst. Professor
Unit: Institute of Forestry
Email: narayant@wrc.edu.np
Research Impact (Google Scholar):
h-index: 2
Total citations: 7
Research Interest/Expertise:
Forest Engineering, Public Procurement, Construction Project Management, Wood Engineering, Concrete Technology
Teaching:
Forest Engineering, Construction Project Management, Transportation Engineering and Planning, Concrete Technology
• Bachelor Degree: Civil Engineering, IOE, Paschimanchal Campus, 2009
• Master Degree: Construction Project Management, Pokhara University, 2015
Professional Affiliations:
Life member-Society of Transport Engineers Nepal (SOTEN)
Founder Member-Nepal Valuers Association (NVA)
Member of Technical Auditor
Member of Surveyor Association
Life member- Nepal Engineering Association
Selected Recent Research Projects:
Estimation of the Forest Biomass Bearing Capacity of Chure Mountain, 6 month, Co-Pi, GON, President Chure-Terai Madhesh Conservation Development Board
Studying Quality/Strength of Five Major Tree Species of Madesh Province, 3 month, PI, Forest Research and Training Center Sagarnath, Sarlahi, Madhesh Province, Nepal.
Preparation of River System Integrated Resource Management Plan East Rapti-1, Narayani-4, Binayi, East Rapti-3 (Manahari-Churlin) and Thute-Shikharbas Khola River System, 6 month, member, President Chure-Terai Madhesh Conservation Development Board.
Preparation of River System Integrated Resource Management Plan Chauda Khola, Banke Hardi, Ghurmi, Pasaha, Kamala Belsot River System, 6 month, member, President Chure-Terai Madhesh Conservation Development Board.
Preparation of River System Integrated Resource Management Plan Chandi Khola River System, Rautahat, 3 month, Co-pi, District Soil Conservation Office, Rautahat.
Technical suggestions and reports for variation orders related to building construction for Mid Western University, Surkhet, 3 month, Co-Pi, Mid Western University.
Technical suggestions and reports for variation orders related to different construction projects for Agricultural and Forestry University, Chitwan, 6 month, Co-Pi, Agricultural and Forestry University.
Third Party Evaluation of Nepal Oil Corporation, Corporate Building, 2 month, Member, NOC.
Third Party Evaluation of Gandaki Province Office Building and other branch Buildings of Rastriya Banijya Bank Ltd., 6 month, Member, RBB.
Preparation of detailed project report for Rapti Technical School, CTEVT, Dang, 6 month, PI, CTEVT
Selected Recent Publications:
Timilsena, N. Users Satisfaction With Domestic WaterSupply in Nepal A Study in Lekhnath Small Town WaterSupply and Sanitation Project Technical Journal, vol. 2, no. 1,Nov. 2020, pp. 135-48, https://doi.org/10.3126/tj.v2i1.32851
(PDF) Association Between Demographic Characteristics of Users' and Overall Satisfaction with Water Supply Service. Available from: Research Gate [accessed Nov 13 2025].
Timilsena, N. (2024). Association Between Demographic Characteristics of Users and Overall Satisfaction with Water Supply Service. International Journal of Science, Technology and Society, 12(3), 96-107. https://doi.org/10.11648/j.ijsts.20241203.11
Er. Narayan Timilsena. "Bioengineering Techniques for Roadside Slope Stabilization in Nepal." International Journal of Engineering and Science, vol. 13, no. 1, 2023, pp. 12-19.
Sudip Acharya , Babu Ram Bhandari , Narayan Timilsina, 2021, Time Overrun Study in Construction Projects of Rural Municipalities in Syangja, Gandaki Province, Nepal, INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH & TECHNOLOGY (IJERT) Volume 10, Issue 08 (August 2021)